Final | 4/18/2019 | 4/18/2019 | 4/18/2019 | P | PASS |
James Ady
|
|
|
Contact Scott for final walk down to close out permit. Phone #: ###-#### Inspection requested via web by Tom Betty Scope of work under this permit is complete. Wiring and final electrical under permit ELE18-01391
|
ELE-Aging Inspection | 4/18/2019 | 4/18/2019 | 4/18/2019 | | DONE |
James Ady
|
|
|
Spoke to Scott. Will verify scope of work is complete and call for final
|
Electrical Rough-In | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | PASS |
James Ady
|
|
|
Contact Tony for east stairwell partial wall and level 2 fire smoke damper clearance. Phone #: ###-#### Inspection requested via web by Tom Betty No inspection needed in East stairwell. Spoke about clearances of smoke dampers. Will check with life safety inspector and get back to contractor.
|
Rough-In Permanent Service | 4/9/2018 | 4/10/2018 | 4/10/2018 | A | CANC |
James Ady
|
|
|
Need U/G service conduit inspection which is located on the south west corner of the project. If you have any questions please call Lonny. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum
|
Electrical Rough-In | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | PASS |
James Ady
|
|
|
Need U/G service conduit inspection which is located on the south west corner of the project. If you have any questions please call Lonny. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum Area listed only ok to cover
|
Electrical Rough-In | 3/7/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
James Ady
|
|
|
Ground rod and ground ring inspection on south side of building foot print. If you have any questions please call. Thanks, Lonny Phone #: ###-#### Inspection requested via web by Lonny Baum ground ring only ok to cover
|
Electrical Rough-In | 2/21/2018 | 2/22/2018 | 2/22/2018 | P | PASS |
Rock A. Hudson
|
|
|
In slab rough in level 1 west end. Phone #: ###-#### Inspection requested via web by Tom Betty Area noted pour rough in ok cover
|
Electrical Rough-In | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
James Ady
|
|
|
Rough in of ground ring on west side exterior of building. Phone #: ###-#### Inspection requested via web by Tom Betty Ground ring inspection should have been NE corner rough in ok
|
Electrical Rough-In | 2/12/2018 | 2/12/2018 | 2/12/2018 | P | PASS |
James Ady
|
|
|
Ground ring Inspection requested via web by Tom Betty ground ring ok to cover
|
Electrical Rough-In | 2/7/2018 | 2/8/2018 | 2/8/2018 | P | PASS |
Rock A. Hudson
|
|
|
Contact John Mittleider for in slab rough in level 1 east end. Phone #: ###-#### Inspection requested via web by Tom Betty East and north east level 1 slab pour rough in ok cover.
|
Electrical Rough-In | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PART |
James Ady
|
|
|
Contact John for ground loop inspection along Jefferson St. side of building. Phone #: ###-#### Inspection requested via web by Tom Betty Ground ring only 1st 50ft ok to cover
|
Electrical Rough-In | 1/26/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
James Ady
|
|
|
Contact John for ufer inspection in southwest corner of basement wall. Phone #: ###-#### Inspection requested via web by Tom Betty ufer only ok to cover
|
Electrical Rough-In | 1/25/2018 | 1/26/2018 | 1/26/2018 | A | PASS |
Eric Story
|
|
|
Please inspect ground loop in trench on east exterior of building. Phone #: ###-#### Inspection requested via web by Tom Betty Ground ring on east side ok to cover
|
Electrical Rough-In | 1/15/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
James Ady
|
|
|
Call John for LL1 ramp rough in of boxes and raceways. Phone #: ###-#### Inspection requested via web by Tom Betty area listed only ok to cover
|
Electrical Rough-In | 12/19/2017 | 12/20/2017 | 12/20/2017 | P | PASS |
James Ady
|
|
|
PVC in concrete slab on LL1 west end. Phone #: ###-#### Inspection requested via web by Tom Betty Area listed ok to cover
|
Electrical Rough-In | 11/28/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
James Ady
|
|
|
Call John Mittleider 1st for in slab lower level 1 east end. Call ###-#### for Tony Keen for 2nd contact. Phone #: ###-#### Inspection requested via web by Tom Betty area listed ok to cover
|
Electrical Rough-In | 10/17/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
Rock A. Hudson
|
|
|
Contact John for in slab rough in of LL2 west end concrete pour. Phone #: ###-#### Inspection requested via web by Tom Betty Area noted rough in ok cover
|
Electrical Rough-In | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | PASS |
James Ady
|
|
|
Contact John Mittleider for in slab rough in inspection of LL2 pour #2. Phone #: ###-#### Inspection requested via web by Tom Betty LL2 Pour 2 only ok to cover
|
Electrical Rough-In | 9/14/2017 | 9/15/2017 | 9/15/2017 | A | PASS |
Rock A. Hudson
|
|
|
Contact John for in slab pvc installation of Lower Level 2 east end. Phone #: ###-#### Inspection requested via web by Tom Betty Pour LL-2 SOD-1 as noted on contractor print rough in ok cover
|
Electrical Rough-In | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PASS |
James Ady
|
|
|
Inspect lower level 3 in slab raceways east half of project. Phone #: ###-#### Inspection requested via web by Tom Betty underground ok to cover
|
Electrical Rough-In | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
James Ady
|
|
|
Call Tony for pvc installation in rebar matte slab lowest level LL3 floor. Phone #: ###-#### Inspection requested via web by Tom Betty Conduit runs from Basement electrical room ok to cover
|