Final | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Sellman Ok final. Inspection was just to close out permit.
|
Permanent Service | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | PASS |
Eric Story
|
|
|
Fault current report is in the panel. The one piece slip coupling has been replaced with a two piece. Phone #: ###-#### Inspection requested via web by Todd Sellman Correction fixed AFCI is 4227 p/s u/g n ok
|
Rough-In Permanent Service | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | CANC |
Eric Story
|
|
|
Issues with the last inspection have been corrected. Phone #: ###-#### Inspection requested via web by Todd Sellman No rough-in needed only p/s
|
Rough-In Permanent Service | 6/5/2017 | 6/6/2017 | 6/6/2017 | A | FAIL |
Rock A. Hudson
|
|
|
Contact is Todd Sellman ###-#### Phone #: ###-#### Inspection requested via web by Todd Sellman Check individual inspections for RI and PS.
|
Permanent Service | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | FAIL |
Rock A. Hudson
|
|
|
Contact is Todd Sellman ###-#### Phone #: ###-#### Inspection requested via web by Todd Sellman 110.24- Available fault current shall be posted prior to permanent service inspection. 352.6- All PVC pipe and fittings shall be listed. Cantex 1 piece expansion joint not listed as shown on manufactureres web sight.
|
Electrical Rough-In | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Rock A. Hudson
|
|
|
Contact is Todd Sellman ###-#### Phone #: ###-#### Inspection requested via web by Todd Sellman Underground rough in ok cover
|