Electrical Rough-In | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Mark Moncarr
|
|
|
Inspect (2ea) disconnects for car lights in the mechanical room . Contact Ben Duke for access ###-#### Phone #: ###-#### Inspection requested via web by steve ragan Installation of 2 lights in mech rm, and 2 lights in elevator pit. Fixtures have protective cages around them
|
Final | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | PASS |
Mark Moncarr
|
|
|
Ok final 2 lights in mech rm, and 2 lights in elevator pit
|
Electrical Rough-In | 5/23/2017 | 5/23/2017 | 5/23/2017 | P | NH |
Mark Moncarr
|
|
|
Inspect (2ea) disconnects for car lights in the mechanical room Phone #: ###-#### Inspection requested via web by steve ragan No access to mech room. Evidently theres only one person who has access to mech room
|