Final | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | PASS |
James Ady
|
|
|
Everything should be good now, Thank you Phone #: ###-#### Inspection requested via web by Rick Beckman Corrections made final ok
|
Final | 9/8/2017 | 9/11/2017 | 9/11/2017 | P | FAIL |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Rick Beckman 210.52 A No point measured horizontaly shall be more than 24in from a recep. Rt of countertop back wall. 110.22 A Disc. shall be clearly identified. Both Furnaces and A/C's.
|
Rough-In Permanent Service | 6/28/2017 | 6/29/2017 | 6/29/2017 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Rick Beckman Rough in ok cover p/s u/g n ok Underground to service not in at time of inspection.
|
Electrical Rough-In | 5/17/2017 | 5/18/2017 | 5/18/2017 | A | PASS |
James Ady
|
|
|
Underground from foundation to fountain and post light in front entry area Phone #: ###-#### Inspection requested via web by Rick Beckman Underground only ok to cover
|