Final | 6/26/2017 | 6/27/2017 | 6/27/2017 | P | PASS |
Tom Saunders
|
|
|
Corbin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg...
corrections made....ok to final
|
Final | 6/12/2017 | 6/14/2017 | 6/14/2017 | A | FAIL |
Tom Saunders
|
|
|
David Joseph ###-#### David Forbes ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg...
1) available fault current label 2) panel needs completely labelled
|
Final | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | CANC |
Tom Saunders
|
|
|
Call Corbin 30 minutes before arriving to meet at actual location ###-####
Phone #: ###-#### Inspection requested via web by Samatha Solberg....
needed perm service inspection first...schedule final once meter set and has power
|
Permanent Service | 5/24/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Tom Saunders
|
|
|
Call Corbin 30 minutes before arriving to meet at actual location ###-####
Phone #: ###-#### Inspection requested via web by Samatha Solberg...
p/s u/g n ok
|