Final | 6/7/2017 | 6/8/2017 | 6/8/2017 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Seth Stears...
labelling done...ok to final...no access to apply final sticker on panel
|
Final | 6/6/2017 | 6/7/2017 | 6/7/2017 | A | CANC |
Tom Saunders
|
|
|
Call Seth @ ###-#### Phone #: ###-#### Inspection requested via web by Seth Stears...
rough in inspection needed scheduled before final....labelling of conduit, breaker, etc. still need done
|
Electrical Rough-In | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | PASS |
Tom Saunders
|
|
|
Call Seth @ ###-#### Phone #: ###-#### Inspection requested via web by Seth Stears....
verified pannels and all equipment UL listed, wire sizing correct and correct breaker size
|