Electrical Rough-In | 11/1/2017 | 11/2/2017 | 11/2/2017 | A | CANC |
Eric Story
|
|
|
pleas call when heading to inspect. Phone #: ###-#### Inspection requested via web by Spencer McLean Needed final
|
Final | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Eric Story
|
|
|
pleas call when heading to inspect. Phone #: ###-#### Inspection requested via web by Spencer McLean Final for kitchen outlets and GFCI protection in living room, NM cable in storge rom protected and a floor will be built in front of panel. Final ok
|
Electrical Rough-In | 6/14/2017 | 6/14/2017 | 6/14/2017 | A | CANC |
Eric Story
|
|
|
Please call before heading to location so that I can make sure access to the building is available. Phone #: ###-#### Inspection requested via web by Spencer McLean Needed conference
|
Conference | 6/14/2017 | 6/14/2017 | 6/14/2017 | P | DONE |
Eric Story
|
|
|
Please call before heading to location so that I can make sure access to the building is available. Phone #: ###-#### Inspection requested via web by Spencer McLean Discussed what areas as workis to be done and will bring what is replace. Main work will be done in kitchen and circuits will be brought to code and as well as placement of receptacles, living room will be fixed from open neutral and GFCI protection on open grounded circuits. Exposed romex above remote panel will be protected from physical damage.
|