Final | 6/12/2017 | 6/14/2017 | 6/14/2017 | A | PASS |
Tom Saunders
|
|
|
If needed onsite, please call one hour ahead. Thanks. Phone #: ###-#### Inspection requested via web by Christian Kilpatrick...
labelling, overcurrent protection, and wire sizing correct...ok to final
|
Final | 6/12/2017 | 6/13/2017 | 6/12/2017 | A | CANC |
Tom Saunders
|
|
|
If needed on-site, please call one hour ahead. Thanks. Phone #: ###-#### >> Inspection requested via web by Christian Kilpatrick Inspection cancelled from web by: Christian Kilpatrick
|
Electrical Rough-In | 6/7/2017 | 6/8/2017 | 6/8/2017 | A | FAIL |
Tom Saunders
|
|
|
Call an hour in advanced if you would like the electrician on site. Phone #: ###-#### Inspection requested via web by Christian Kilpatrick...
not all equipment being installed on job site...rails and combiner box but no panels installed...unable to verify listing...tried to make contact with phone number given and could not reach or leave message
|
Electrical Rough-In | 6/7/2017 | 6/8/2017 | 6/7/2017 | A | CANC |
Tom Saunders
|
|
|
Call an hour in advance if you would like the electrician there Phone #: ###-#### >> Inspection requested via web by Christian Kilpatrick Inspection cancelled from web by: Christian Kilpatrick
|