Final | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Ok final. Contractor was there and istalled 1 plate for door opener recept.
|
Rough-In Permanent Service | 6/7/2017 | 6/8/2017 | 6/7/2017 | A | PASS |
Mark Moncarr
|
|
|
Troy Phone #: ###-#### p/s u/g n ok. Looked at on 6/7/17, contractor installed riser for meter and GFI protected temp outlets.
|
Rough-In Permanent Service | 6/6/2017 | 6/7/2017 | 6/7/2017 | A | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Don Conley No service at this time
|
Electrical Rough-In | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Rough-in ok cover
|
Permanent Service | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Install riser 590.6 GFCI protection for all 120v receptacles for temporary installations
|
Rough-In Permanent Service | 6/6/2017 | 6/7/2017 | 6/6/2017 | P | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### >> Inspection requested via web by Don Conley Inspection cancelled from web by: Don Conley
|