ELE-Aging Inspection | 4/25/2019 | 4/25/2019 | 4/25/2019 | | DONE |
James Ady
|
|
|
Spoke to Ryan. Explained inspection process and fees. Will final permit at this time.
|
Final | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
James Ady
|
|
|
Sign final ok
|
Electrical Rough-In | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
James Ady
|
|
|
Sign rough in ok
|