Final | 12/7/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok final.
|
Final | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | PART |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Partial final. 2 areas in question are wire to left of coffee bar, and MC stub on S entry soffit for signage. Talked to contractor, both areas are not terminated to power, and also safed off. Partial is for the moving in of furniture, and for employee training only. Not for business purposes until final is completed.
|
Electrical Rough-In | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover. A few areas needed attention. Contractor was on site and is going to strap MC in 2 locations.
|
Electrical Rough-In | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover teller half walls in lobby.
|
Permanent Service | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins p/s already energized. Looked at on 10/10/17
|
Electrical Rough-In | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Mark Moncarr
|
|
|
Grid ceiling cover inspection Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover ceiling throughout.
|
Electrical Rough-In | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | PASS |
Mark Moncarr
|
|
|
Inspect can light and hard lid Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover 1 can above coffee bar E side of lobby.
|
Electrical Rough-In | 10/26/2017 | 10/26/2017 | 10/26/2017 | P | PASS |
Rock A. Hudson
|
|
|
Canopy vestibule area Phone #: ###-#### Inspection requested via web by Tom Jenkins South vestibule ceiling rough in ok cover
|
Electrical Rough-In | 10/25/2017 | 10/26/2017 | 10/26/2017 | A | FAIL |
Rock A. Hudson
|
|
|
Rough in ceiling for canopies on South wall. Heaters and can lights Phone #: ###-#### Inspection requested via web by Tom Jenkins 300.4(E)- Cables shall not be installed with in 1 1/2" of roof deck. 314.17(A)- Unused openings shall be sealed. East can junction box.
|
Electrical Rough-In | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Mark Moncarr
|
|
|
South wall cover inspection. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover S wall. Exit light, and push button for emergency egress.
|
Rough-In Permanent Service | 10/9/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Mark Moncarr
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins p/s u/g n ok
|
Electrical Rough-In | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | PASS |
Mark Moncarr
|
|
|
Rough in ceiling in loby Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover inside lobby and exterior soffit S side with 6 cans.
|
Electrical Rough-In | 9/21/2017 | 9/21/2017 | 9/21/2017 | P | PASS |
Mark Moncarr
|
|
|
Wall cover and exterior soffit. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover soffit, and interior wall SE side.
|
Electrical Rough-In | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover N side stick frame.
|
Electrical Rough-In | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover. Power pedestal for street lights. Public works inspected 3 pole bases.
|
Electrical Rough-In | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover trench in alley way behind bank
|
Electrical Rough-In | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Mark Moncarr
|
|
|
Rough-in for electrical floor boxes in offices Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover floor boxes 2 locations.
|
Electrical Rough-In | 6/20/2017 | 6/20/2017 | 6/20/2017 | P | PASS |
Mark Moncarr
|
|
|
Ufer ground inspection. Please inspect before 3:30 if possible please. Concrete is showing up then. Thank you! Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover. 1/0 copper used.
|