Final | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI Ok final. Light over hottub GFI protected, tub bonded to pool cover, back fence bonded through so both sections are continuous on both sides of gate.
|
Final | 11/9/2017 | 11/13/2017 | 11/13/2017 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI
|
Rough-In Permanent Service | 8/29/2017 | 8/29/2017 | 8/29/2017 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI p/s u/g n ok
|
Electrical Rough-In | 6/20/2017 | 6/20/2017 | 6/20/2017 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI Ok cover. EQ bonding. 8 locations on long sides of pool have rebar formed into pool for lifting purposes. All locations have been tagged off EQ ring. 1 steel I-beam also bonded on N side of pool down low. 1 bond for auto cover.
|
Electrical Rough-In | 6/15/2017 | 6/16/2017 | 6/16/2017 | A | CANC |
Mark Moncarr
|
|
|
Pool bond for apron and motorized cover Phone #: ###-#### Inspection requested via web by TOM BICANDI Contractor wants to change to a Conference to discuss pool equipotential bonding
|