Final | 8/28/2017 | 8/28/2017 | 8/28/2017 | P | PASS |
James Ady
|
|
|
Will Phone #: ###-#### Final ok
|
Electrical Rough-In | 6/20/2017 | 6/26/2017 | 6/26/2017 | P | PASS |
James Ady
|
|
|
Will Phone #: ###-#### between 12 and 2 Dn bath, laundry and bar ok to cover
|
Electrical Rough-In | 6/20/2017 | 6/20/2017 | 6/20/2017 | P | CANC |
James Ady
|
|
|
Will Phone #: ###-####
|
Conference | 6/16/2017 | 6/19/2017 | 6/19/2017 | P | DONE |
James Ady
|
|
|
Will Phone #: ###-#### Laundry room/ Down bath remodel. Discussed wire support, Box fill, Tamper resit Receps, wet location rated can trim in shower
|