Final | 2/27/2018 | 2/28/2018 | 2/28/2018 | A | PASS |
Mark Moncarr
|
|
|
I will be on-site by 9am Phone #: ###-#### Inspection requested via web by Sean Patton Ok final.
|
Permanent Service | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Mark Moncarr
|
|
|
New 200 amp service at garage. Will be ready late afternoon. 2-3 Phone #: ###-#### Inspection requested via web by Sean Patton p/s o/h n ok
|
Electrical Rough-In | 12/21/2017 | 12/22/2017 | 12/22/2017 | A | PASS |
Mark Moncarr
|
|
|
Inspection for cover on bathroom floor heat system. I will be onsite at 8 am. Phone #: ###-#### Inspection requested via web by Sean Patton Ok cover floor heat. Switches are on wall immediately upon entry. Not located directly in shower area. There will be a dividing wall that comes out 40". Switches will not be in actuall shower area. Contractor is going to GFI protect switches.
|
Electrical Rough-In | 10/8/2017 | 10/9/2017 | 10/9/2017 | P | PASS |
Mark Moncarr
|
|
|
Rough in for cover on exterior walls only. Homeowner is looking to start spraying insulation on Tuesday. There are a couple of interior walls that have not been completed yet. Phone #: ###-#### Inspection requested via web by Sean Patton Ok cover.
|