Final | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Final ok, will pull new permit for wash bay
|
Final | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PART |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Partial for office spaces, bathrooms,and isnpection bay ok to occupy. Wash bay will be finished on another date to final permit out
|
Electrical Rough-In | 10/31/2017 | 11/3/2017 | 10/31/2017 | P | CANC |
Eric Story
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|
Electrical Rough-In | 9/15/2017 | 9/18/2017 | 9/18/2017 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ceilings in new office and lobby only ok to cover
|
Electrical Rough-In | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | PASS |
James Ady
|
|
|
U/G inspection please. Dan is the site contact. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Underground from shop to Gate only ok to cover
|
Permanent Service | 8/11/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Available fault current calc will be posted proir to service being energized p/s u/g n ok
|
Electrical Rough-In | 8/2/2017 | 8/3/2017 | 8/3/2017 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Walls and hard lids in existing building ok cover
|
Electrical Rough-In | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Concrete encased electrode ok cover
|
Conference | 6/27/2017 | 6/28/2017 | 6/28/2017 | P | DONE |
Eric Story
|
|
|
Vehicle Inspection Pit Phone #: ###-#### Inspection requested via web by Kerri Hamilton Will need a area of classification by a licensed engineer to deem area for inspection and work to be done...
|