Final | 3/21/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
James Ady
|
|
|
Final inspection Phone #: ###-#### Inspection requested via web by Kenneth Chapman Final ok
|
Electrical Rough-In | 9/12/2017 | 9/12/2017 | 9/12/2017 | A | PASS |
James Ady
|
|
|
Mail box building rough cover Phone #: ###-#### Inspection requested via web by Kenneth Chapman ok to cover
|
Electrical Rough-In | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | PART |
James Ady
|
|
|
Rough inspection mail box station by office Phone #: ###-#### Inspection requested via web by Kenneth Chapman Disc means needed for seperate structure. 2 East bays of ceiling only. ok to cover.
|
Electrical Rough-In | 8/28/2017 | 8/28/2017 | 8/28/2017 | A | PASS |
James Ady
|
|
|
Pool grounding ring and under ground to gazebo Phone #: ###-#### Inspection requested via web by Kenneth Chapman EQ bonding, Hand rails, Chairlift, bonding ok
|
Final | 7/26/2017 | 7/27/2017 | 7/28/2017 | P | CANC |
James Ady
|
|
|
Lower level clubhouse electrical final. Also re inspect corrections on appartment level of clubhouse. Phone #: ###-#### Inspection requested via web by Harley Woodward Wrong permit called in
|
Final | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | CANC |
James Ady
|
|
|
Re inspect corrections for clubhouse. Phone #: ###-#### Inspection requested via web by Harley Woodward Wrong permit
|
Final | 7/25/2017 | 7/26/2017 | 7/26/2017 | P | FAIL |
James Ady
|
|
|
Apartments 201-206 final. Phone #: ###-#### Inspection requested via web by Harley Woodward 206 Bed lighting AFCI, 205 Recep end of Penn. non-tamper, 204 Recep Lt of cooktop non-tamper Move Book shelves in bed 2 from infront of receps., 203 ok, 202 ok, CHeck rooftop receps for type WR rating.
|