Final | 9/29/2017 | 10/3/2017 | 10/3/2017 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Perez no sign off sheet. Final ok
|
Final | 9/28/2017 | 9/29/2017 | 9/28/2017 | P | CANC |
James Ady
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kevin Perez Inspection cancelled from web by: Kevin Perez
|
Electrical Rough-In | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | PASS |
James Ady
|
|
|
Jarod needs a temp occupancy Phone #: ###-#### Most of work was Demo. Ceiling only ok to cover
|
Final | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | PART |
James Ady
|
|
|
Jarod needs a temp occupancy Phone #: ###-#### Temp final only ok
|