Final | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Eric Story
|
|
|
Zack Phone #: ###-#### Bath final ok
|
Electrical Rough-In | 10/23/2017 | 10/26/2017 | 10/26/2017 | P | PASS |
Rock A. Hudson
|
|
|
Zack-can only be there after 3:30 so would like inspection after taht if possible Phone #: ###-#### Master bathroom addition rough in ok cover
|
Final | 7/18/2017 | 7/21/2017 | 7/21/2017 | A | CANC |
Eric Story
|
|
|
ZAK Phone #: ###-#### No final needed just conference
|
Conference | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | DONE |
Eric Story
|
|
|
ZAK Phone #: ###-#### Discussed wiring of new bath addition, tamper and weather resistant plus GFCI portection of receptacles. Panel change in garage will be done on different day, Dad is helping and is a Cali general contractor seems to have it all handle......
|