Final | 9/13/2017 | 9/14/2017 | 9/14/2017 | A | PASS |
James Ady
|
|
|
Any Questions please call Louis At ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller final ok
|
Electrical Rough-In | 8/3/2017 | 8/4/2017 | 8/4/2017 | A | PASS |
James Ady
|
|
|
potting bonding and equal potential Phone #: ###-#### Inspection requested via web by Louis Keller Hand rail and stuco flashing needs to be bonded before final. EQ bonding and potting ok
|
Electrical Rough-In | 8/3/2017 | 8/4/2017 | 8/3/2017 | A | CANC |
James Ady
|
|
|
potting equal potential and underground Phone #: ###-#### >> Inspection requested via web by Louis Keller Inspection cancelled from web by: Louis Keller
|
Electrical Rough-In | 7/26/2017 | 7/27/2017 | 7/27/2017 | A | PASS |
Mark Moncarr
|
|
|
Cover up inspection Phone #: ###-#### Inspection requested via web by Louis Keller Ok cover. 1 light N side
|
Electrical Rough-In | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | PASS |
James Ady
|
|
|
Bonding Inspection Phone #: ###-#### Inspection requested via web by Louis Keller 4 corners only ok to cover
|