Final | 11/7/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
James Ady
|
|
|
Approved plans onsite, Idaho Power will be out that morning to unlock disconnect. Thanks Phone #: ###-#### Inspection requested via web by Ryan King Solar only Final ok
|
Final | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | FAIL |
Eric Story
|
|
|
Idaho power has locked out disc for solar array system can't verify if system works
|
Final | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | NR |
James Ady
|
|
|
Approved plans onsite, Ryan King can answer questions @ ###-####. Phone #: ###-#### Inspection requested via web by Ryan King Wrong job called in Not Ready
|
Electrical Rough-In | 10/6/2017 | 10/9/2017 | 10/9/2017 | A | PASS |
Rock A. Hudson
|
|
|
Listing inspection for panel and inverters. Rooftop crew will be onsite. Phone #: ###-#### Inspection requested via web by Ryan King Listing confirmed. Rough in ok
|