Electrical Rough-In | 8/1/2017 | 8/1/2017 | 8/1/2017 | P | PASS |
James Ady
|
|
|
Installation of conduit and wire for 4 machines and air compressor. Contact Damonn Barr Phone #: ###-#### Inspection requested via web by Cathy Duchek 1 Compressor 4 machines Rough in ok
|
Final | 8/1/2017 | 8/1/2017 | 8/1/2017 | P | PASS |
James Ady
|
|
|
Installation of conduit and wire for 4 machines and air compressor. Contact Damonn Barr Phone #: ###-#### Inspection requested via web by Cathy Duchek 1 compressor 4 machines. Final ok
|