Final | 8/30/2017 | 9/5/2017 | 9/5/2017 | A | PASS |
Rock A. Hudson
|
|
|
Call Erik for final of phase 4 TI space. Early AM preferred, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Final ok
|
Electrical Rough-In | 8/28/2017 | 8/29/2017 | 8/29/2017 | A | PASS |
Eric Story
|
|
|
Call Erik for ceiling grid inspection of phase 4 TI space. As close to 10am as possible please, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Phsase 4 ceiling only ok cover
|
Electrical Rough-In | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | PASS |
Rock A. Hudson
|
|
|
Call Rafael for inspection of office remodel area on the corner of 9th and Front Street in the Boise Centre building. Framed walls only. As close to 1pm-2pm as possible. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Walls and filing rm hardlid rough in ok cover
|