Final | 8/17/2017 | 8/18/2017 | 8/18/2017 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Paula Gietzen Solar array final ok
|
Rough-In Permanent Service | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | CANC |
Eric Story
|
|
|
Rough in on Solar Array Phone #: ###-#### Inspection requested via web by Paula Gietzen No p/s needed just a rough-in oly
|
Electrical Rough-In | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Eric Story
|
|
|
Rough in on Solar Array Phone #: ###-#### Inspection requested via web by Paula Gietzen Verifeid u/l listing for solar array system and scope of work..... Ok to proceed with install, final will be called in as soon as finished with project..
|