Final | 12/20/2017 | 12/20/2017 | 12/20/2017 | P | PASS |
Mark Moncarr
|
|
|
Install 2 sets of letters and 2 logos on building. All Primary Power by Others Phone #: ###-#### Inspection requested via web by Ken Olsen Ok final. See RI notes.
|
Electrical Rough-In | 12/20/2017 | 12/20/2017 | 12/20/2017 | A | PASS |
Mark Moncarr
|
|
|
Install 2 sets of letters and 2 logos on building. All Primary Power by Others Phone #: ###-#### Inspection requested via web by Ken Olsen Ok cover. Signs have disconnects located on them, and fed with a 20a circuit.
|