Final | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Called to have address changed to 1423 W. Grove st where receptacle is actually installed. Final ok
|
Electrical Rough-In | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Rough in ok
|
Final | 8/11/2017 | 8/11/2017 | 8/11/2017 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov See rough in notes.
|
Electrical Rough-In | 8/11/2017 | 8/11/2017 | 8/11/2017 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov 590.6(B)- Receptacles other than 120 volt used as temp power for construction shall have GFCI protection. Actual address 1423 W. Grove st. Receptacle installed on back of this address for construction of 1420 W Front.
|