Final | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | PASS |
James Ady
|
|
|
Plans on-site, call with questions - Jenn, ext 123 Phone #: ###-#### Corrections made final ok
|
Final | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | FAIL |
James Ady
|
|
|
Jenn ext 123 Phone #: ###-#### All rain tight connectors shall be made wrench tight as per manufacturer specifications.
|
Electrical Rough-In | 9/25/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
James Ady
|
|
|
Jennifer ex 123 Phone #: ###-#### UL listing only ok
|