ELE-Aging Inspection | 2/24/2020 | 2/24/2020 | 2/26/2020 | | PASS |
Tom Saunders
|
|
|
closing permit...no other work in 180 days...see rough-in notes for what looked at...permit finaled
|
Final | 2/26/2020 | 2/26/2020 | 2/26/2020 | A | PASS |
Tom Saunders
|
|
|
as noted in rough inspection recepticles where lowered...no new walls...no other work done closing permit
|
ELE-Aging Inspection | 11/4/2019 | 11/4/2019 | 11/4/2019 | | FAIL |
Tom Saunders
|
|
|
required inspections not being addressed
|
ELE-Aging Inspection | 8/5/2019 | 8/5/2019 | 8/5/2019 | | FAIL |
Tom Saunders
|
|
|
required final needs scheduled
|
Electrical Rough-In | 8/13/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Rock A. Hudson
|
|
|
Please inspect the South West most room in the back of the house and approve for cover so that sheetrock and then framing for that closet can be added inside that room. The room was an office before with above counter outlets and is being converted to a bedroom. (We will have future rough-in inspections in the kitchen and other areas of the house at a later date.) Phone #: ###-#### Inspection requested via web by nathan palmer Drying out house from flood. Kitchen cabinet layout may change in future. No new walls as of this inspection. Lowered receptacle locations in room noted rough in ok cover
|