Final | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Tom Saunders
|
|
|
Mark Phone #: ###-####-please call 20 minutes prior to meet for access...corrections made..ok to final
|
Final | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | FAIL |
Eric Story
|
|
|
Mark Phone #: ###-#### Tamper resisitant required through out house AFCI protection required not GFCI for bedrooms
|
Electrical Rough-In | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
James Ady
|
|
|
MARK DEALY - PLEASE CALL HIM BEFORE ARRIVAL - HE IS 4 DOORS DOWN AND WILL MEET INSPECTOR AT SITE. Phone #: ###-#### shop/ pump house only ok to cover. will have ufer connection accessable at final
|
Electrical Rough-In | 9/12/2017 | 9/12/2017 | 9/12/2017 | P | PASS |
Tom Saunders
|
|
|
Mark Phone #: ###-####...
uffer ground and underground to shed
|
Conference | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | PASS |
Tom Saunders
|
|
|
Mark-call when on way-will be 4 dorrs down Phone #: ###-####...
discussed requirements for power to shed...amperage minimums, lighting, number breakers, pipe depth to shed, future inspections
|