Final | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Eric Story
|
|
|
Shane Phone #: ###-#### Occ card signed Final ok
|
Final | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | CANC |
Eric Story
|
|
|
Morning will work best for me please call and give me call and a time I will have to meet you there to unlock the building Phone #: ###-#### >> Inspection requested via web by shane miller Inspection cancelled from web by: shane miller
|
Electrical Rough-In | 10/2/2017 | 10/3/2017 | 10/3/2017 | A | PASS |
Eric Story
|
|
|
Removed a wall and rewired added a stage that needs to be inspected Phone #: ###-#### Inspection requested via web by shane miller Both stages and kitchen walls only ok cover
|
Electrical Rough-In | 9/6/2017 | 9/8/2017 | 9/8/2017 | A | PASS |
Eric Story
|
|
|
Need an inspection to backfill trench dug for underground service lateral Phone #: ###-#### Inspection requested via web by shane miller u/g for service feeders and bath walls and hard lids as well as hall off bath ceiling ok to cover
|
Electrical Rough-In | 8/25/2017 | 8/29/2017 | 8/29/2017 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by shane miller Walls and hard lids ok to cover minus ADA bathroom and hall leading to hall will call when finished.
|
Electrical Rough-In | 8/24/2017 | 8/28/2017 | 8/25/2017 | A | CANC |
Eric Story
|
|
|
Phone #: ###-#### >> Inspection requested via web by shane miller Inspection cancelled from web by: shane miller
|