Temporary Service | 8/21/2017 | 8/21/2017 | 8/21/2017 | A | PASS |
Mark Moncarr
|
|
|
t/s u/g n ok. Correction made.
|
Final | 8/18/2017 | 8/21/2017 | 8/21/2017 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by steve cooper Temp services need to be called for TEMP service. IDP wont energize if its a final. Once temp poles are energized, they are automatically finaled out.
|
Final | 8/17/2017 | 8/18/2017 | 8/18/2017 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by steve cooper Article 250.53(G) Ground showing hacksaw marks
|