ELE-Aging Inspection | 8/4/2020 | 8/4/2020 | 8/4/2020 | | PASS |
Daryl DeGrange
|
|
|
see final
|
Final | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
Daryl DeGrange
|
|
|
Inspections completed on permit ELE17-02863 final ok
|
ELE-Aging Inspection | 5/5/2020 | 5/5/2020 | 5/5/2020 | | DONE |
Mark Moncarr
|
|
|
Cannot inspect at this time due to Covid-19
|
ELE-Aging Inspection | 2/4/2020 | 2/4/2020 | 2/4/2020 | | DONE |
Mark Moncarr
|
|
|
3rd attempt. Please bring 1 ea components to address to verify UL listing and final out project.
|
ELE-Aging Inspection | 11/5/2019 | 11/5/2019 | 11/5/2019 | | DONE |
Mark Moncarr
|
|
|
Please schedule a final inspection. Refer to notes on 8/6/19
|
ELE-Aging Inspection | 8/6/2019 | 8/6/2019 | 8/6/2019 | | DONE |
Mark Moncarr
|
|
|
Please schedule a final inspection. Will need to bring 1 ea of equipt installed to verify UL listing. For future solar installations a RI inspection will be needed prior to install of any components.
|