Final | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Jesse Simpson...
labelling, ocpd, and disconnect...ok
|
Electrical Rough-In | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Jesse Simpson....
listed equipment installed...ok
|
Final | 9/6/2017 | 9/7/2017 | 9/7/2017 | A | FAIL |
Tom Saunders
|
|
|
Please contact Rob Kelley ###-####, our lead installer, so that he can meet you for the inspection. Phone #: ###-#### Inspection requested via web by Jesse Simpson....
as per Boise City ordinance a rough inspection must be called in first before a final inspection can be scheduled....contractor has been made aware of multiple times...contractor will need to be at inspection with ladder or equipment on the ground to verify listing
|