Electrical Rough-In | 11/21/2017 | 11/21/2017 | 11/21/2017 | A | CANC |
Eric Story
|
|
|
Walls rough in- in lab area Phone #: ###-#### Inspection requested via web by Jason Wicks Needed final
|
Final | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | PASS |
Eric Story
|
|
|
Walls rough in- in lab area Phone #: ###-#### Inspection requested via web by Jason Wicks Final ok card on site and signed
|
Final | 10/30/2017 | 10/30/2017 | 10/30/2017 | P | PART |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Wicks Partial final ok
|
Electrical Rough-In | 10/14/2017 | 10/16/2017 | 10/16/2017 | A | PASS |
Eric Story
|
|
|
Ceiling inspection for cover Phone #: ###-#### Inspection requested via web by Jason Wicks Ceilings only ok to cover
|
Electrical Rough-In | 9/20/2017 | 9/20/2017 | 9/20/2017 | A | PASS |
Eric Story
|
|
|
Wall with Panel rough in Phone #: ###-#### Inspection requested via web by Jason Wicks Panel wall only ok to cover
|
Electrical Rough-In | 8/31/2017 | 8/31/2017 | 8/31/2017 | A | PASS |
Eric Story
|
|
|
First floor east side of building, New electrical in the newly framed walls Phone #: ###-#### Inspection requested via web by Jason Wicks Room #108 walls only on east side ok to cover, GC will figure out building permit and will have it on site soon.....
|