Electrical Rough-In | 9/14/2017 | 9/15/2017 | 9/15/2017 | A | PASS |
James Ady
|
|
|
I will meet you on site with a Panel and DC optimizer to show all UL Listings Phone #: ###-#### Inspection requested via web by Jesse Simpson Rough in ok
|
Final | 9/15/2017 | 9/15/2017 | 9/15/2017 | P | PASS |
James Ady
|
|
|
I will meet you on site with a Panel and DC optimizer to show all UL Listings Phone #: ###-#### Inspection requested via web by Jesse Simpson Final ok
|
Final | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | CANC |
James Ady
|
|
|
Rough-in and Final Inspection Today. Call Micah at ###-#### for official meeting time. Thanks, James! Phone #: ###-#### >> Inspection requested via web by Jesse Simpson Inspection cancelled from web by: Jesse Simpson
|