Final | 11/15/2017 | 11/15/2017 | 11/15/2017 | A | PASS |
James Ady
|
|
|
All trim is installed, all circuits are on, panel has been labeled, lights are functioning on sensors, Door will be unlocked. Phone #: ###-#### Inspection requested via web by Kurt Carlson Final ok
|
Electrical Rough-In | 11/9/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
James Ady
|
|
|
Request a ceiling rough in. All boxes are closed up, conduits strapped, lights are installed, slack wires are installed on opposite corners of the lights, light sensors that install in t-grid are the only unfinished item in the ceiling. Please call a little before arriving at site so I can make sure it is open. Thanks Kurt Phone #: ###-#### Inspection requested via web by Kurt Carlson Ceiling only ok to cover
|
Electrical Rough-In | 9/28/2017 | 9/28/2017 | 9/28/2017 | A | PASS |
James Ady
|
|
|
The conference room floor box is ready for inspection, Phone #: ###-#### Inspection requested via web by Kurt Carlson Floor box only ok to cover
|
Electrical Rough-In | 9/21/2017 | 9/22/2017 | 9/22/2017 | P | PASS |
Eric Story
|
|
|
Walls are ready for inspection. Overhead inspection to follow at later date. Inspection requested via web by Kurt Carlson Walls only minus conference room ok cover
|