Final | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Rock A. Hudson
|
|
|
Lock outs are in place, owners contractor is making the outlets in the room where the load center is located accessible for final testing! I am in Meridian so if I could get a call i''m about 30 min away to meet up! Thx. Steve BPL Phone #: ###-#### Inspection requested via web by Steven Meredith Final ok
|
Final | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | PART |
Eric Story
|
|
|
I can meet at 9:00 if that''s fine! Steve Phone #: ###-#### Inspection requested via web by Steven Meredith Part final, all life safety checked out and contractor will provide one more inspection for front patio receptacle that will be added.
|
Temporary Service | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | CANC |
Eric Story
|
|
|
I should be available after 2:00 pm. I need a short conference with you also about temp service ; temporary occupancy as well! Thx Steve, BPL Phone #: ###-#### Inspection requested via web by Steven Meredith Power on house to remain during construction and will pull seperate permit for garage once constructed
|
Electrical Rough-In | 9/15/2017 | 9/18/2017 | 9/18/2017 | A | PASS |
Eric Story
|
|
|
I will be there in the morning to let you in at 8:00am or shortly after!
Steve, BPL Phone #: ###-#### Inspection requested via web by Steven Meredith Whole house remodel ok to cover
|
Conference | 9/8/2017 | 9/11/2017 | 9/11/2017 | A | DONE |
Eric Story
|
|
|
Anytime after 9:00am would work out great and for access also, Thx! You can call me as I should be on site by then @ ###-#### Steve, Phone #: ###-#### Inspection requested via web by Steven Meredith Discussed AFCI protection for bedrooms and service on detached garage
|