Final | 9/11/2017 | 9/12/2017 | 9/12/2017 | P | PASS |
Mark Moncarr
|
|
|
I won''t be able to make it until the late afternoon, but my wife should be available to let the inspector in and I should be able to speak with them on the phone as they''re doing the inspection. Phone #: ###-#### Inspection requested via web by Zach Bastian Ok final.
|
Electrical Rough-In | 9/12/2017 | 9/12/2017 | 9/12/2017 | P | PASS |
Mark Moncarr
|
|
|
Ok cover. Added 2 cutin LED lights and added 1 receptacle.
|
Conference | 9/7/2017 | 9/8/2017 | 9/8/2017 | P | DONE |
Mark Moncarr
|
|
|
I didn''t see that the preliminary inspection was mandatory! Sorry. Anyway, I''ll have holes in the ceiling and some of the wire fished by the time you arrive. Phone #: ###-#### Inspection requested via web by Zach Bastian Discussed the addition of new LED lighting, and adding 1 recept of existing circuit. Also discussed Tamper Resist Recept.
|
Permanent Service | 9/2/2017 | 9/8/2017 | 9/7/2017 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### >> Inspection requested via web by Zach Bastian Inspection cancelled from web by: Zach Bastian
|