Final | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Eric Story
|
|
|
Basement - Inspect the wires that were re-routed, for the upstairs remodel. Thank you Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Contractor stated he would take responsibility for floor heat install in master bath, fixed open wiring in basement for this inspection. Final ok
|
Electrical Rough-In | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | CANC |
Tom Saunders
|
|
|
Inspect the main floor, so the homeowners can move out of the basement and I can demo the temporary wiring, plus do some misc. wiring. Inspect panel and sub-panel. Thank you Phone #: ###-#### Inspection requested via web by Lonnie Sorichta...needed partial final
|
Final | 10/13/2017 | 10/13/2017 | 10/13/2017 | A | PART |
Tom Saunders
|
|
|
Inspect the main floor, so the homeowners can move out of the basement and I can demo the temporary wiring, plus do some misc. wiring. Inspect panel and sub-panel. Thank you Phone #: ###-#### Inspection requested via web by Lonnie Sorichta....partial final to pass upstairs...job taken over from previous electrician with permit ELE17-01278...contractor will work on downstairs cleaning up temp wiring and old wiring. walls will not be opened up downstairs. most work done in ceiling
|
Conference | 9/4/2017 | 9/5/2017 | 9/5/2017 | P | DONE |
Eric Story
|
|
|
I took this job over and I would like to do a walk through. It is in the Trim-out stage, and I was told it had the Rough-in inspection. Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Nothing much to tak about. Floor heat was never look at needs to be verified and taken resposible person to ow n job
|