Final | 12/12/2018 | 12/13/2018 | 12/13/2018 | P | PASS |
Eric Story
|
|
|
Please call ###-#### ###-#### Let them know you need inside. They will come let you in. Phone #: ###-#### Inspection requested via web by Kendra Lanham Back area not to used as automotov repair... Card signed Final ok
|
Final | 11/9/2018 | 11/13/2018 | 11/13/2018 | P | FAIL |
Eric Story
|
|
|
Please inspect and close. Phone #: ###-#### Inspection requested via web by Kendra Lanham 406 Faceplates required and all lights need finished, re-inspection fee assessed
|
Electrical Rough-In | 7/30/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Eric Story
|
|
|
Please provide and electrical rough-in inspection for cover. Contact for job site is Darren ###-####. Our number is (208)-###-#### Phone #: ###-#### Inspection requested via web by Kendra Lanham Hard lids and wall in garage on office wall ok to cover
|
Final | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | CANC |
Eric Story
|
|
|
Alteration: There was a fire, re-energized 400amp service Phone #: ###-#### Inspection requested via web by Kendra Lanham Not ready at this time
|
Conference | 9/6/2017 | 9/7/2017 | 9/7/2017 | A | CANC |
Eric Story
|
|
|
Please call Todd Lanham ###-#### Phone #: ###-#### Inspection requested via web by Kendra Lanham Talked about re-energizing service and moving items to get clearences from panels and meter will give p/s for power to building. All circuits damaged will be replaced
|
Permanent Service | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Eric Story
|
|
|
Please call Todd Lanham ###-#### Phone #: ###-#### Inspection requested via web by Kendra Lanham p/s u/g rec ok
|