Final | 9/14/2017 | 9/15/2017 | 9/15/2017 | P | PASS |
James Ady
|
|
|
Please call ahead if possible as I will need to have it unlocked and a person there for you thanks much and have a great day. Phone #: ###-#### Inspection requested via web by Cindie Swaim Final ok
|
Electrical Rough-In | 9/7/2017 | 9/8/2017 | 9/8/2017 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Cindie Swaim At time of inspection rack system and array panels being installed. No raceways or wiring to service installed yet. Listing confirmed on enphase micro inverters and panels. rough in ok
|