ELE-Aging Inspection | 6/25/2020 | 6/25/2020 | 6/25/2020 | | PEND |
Daryl DeGrange
|
|
|
The permit is still open with the City of Boise. Please call 208 ###-#### with progress report or any questions. If your job is complete, please schedule an final inspection online. Thank you!
|
ELE-Aging Inspection | 3/26/2020 | 3/26/2020 | 3/26/2020 | | CANC |
Eric Story
|
|
|
Still waiting
|
ELE-Aging Inspection | 10/21/2019 | 10/21/2019 | 10/24/2019 | | DONE |
Eric Story
|
|
|
Contractor will look into job and schedule a final
|
Final | 9/8/2017 | 9/11/2017 | 9/11/2017 | P | DONE |
Eric Story
|
|
|
Michael Donelson ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Discussed service change on manufactored home, will to talk with Darrell and discuss options for job.
|
Electrical Rough-In | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | PASS |
Eric Story
|
|
|
Michael Donelson ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Kitchen Rough-in ok cover
|