Electrical Rough-In | 10/24/2017 | 10/24/2017 | 10/24/2017 | P | CANC |
James Ady
|
|
|
Rough In Solar Array Phone #: ###-#### Inspection requested via web by Paula Gietzen
|
Final | 10/24/2017 | 10/24/2017 | 10/24/2017 | P | PASS |
James Ady
|
|
|
Rough In Solar Array Phone #: ###-#### Inspection requested via web by Paula Gietzen Final ok
|
Final | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | FAIL |
James Ady
|
|
|
Ready for Solar Final Phone #: ###-#### Inspection requested via web by Paula Gietzen No rough in inspection. Will need to reschedule and set up time to meat onsite.
|