Final | 9/26/2017 | 9/26/2017 | 9/26/2017 | P | PASS |
Mark Moncarr
|
|
|
Final on solar array Phone #: ###-#### Inspection requested via web by Paula Gietzen Ok final.
|
Final | 9/21/2017 | 9/25/2017 | 9/25/2017 | A | CANC |
Mark Moncarr
|
|
|
Solar Array System Final Inspection Phone #: ###-#### Inspection requested via web by Paula Gietzen Amps and volts on disconnect needs filled out.
|
Electrical Rough-In | 9/21/2017 | 9/22/2017 | 9/22/2017 | A | PASS |
Mark Moncarr
|
|
|
Solar Array System Rough In Inspection Phone #: ###-#### Inspection requested via web by Paula Gietzen All components UL listed.
|