Final | 4/30/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Mark Moncarr
|
|
|
Final Electrical inspection. All phases of Electrical have been trimmed. Customer has not installed floors or done touch up on home, however all Electrical has been completed and Trimmed. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes Ok final.
|
Electrical Rough-In | 10/8/2017 | 10/10/2017 | 10/10/2017 | A | PASS |
Mark Moncarr
|
|
|
Inspect Sub-Panel that was moved off the stairs over to the right so as not to be in the stair well. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes Ok cover. Panel was moved off stairwell.
|
Electrical Rough-In | 9/25/2017 | 9/25/2017 | 9/25/2017 | P | PASS |
Mark Moncarr
|
|
|
Please take note that Idaho Power will be doing an underground Service and the trench will be dug sometime this week to install the PVC. The Sub-Panel upstairs is Hot and has the new Branch Circuit there, however, not landed due to waiting for Idaho Power to kill power on old panel and inspection for New Service. We need an inspection for the new panel as well to have power swung when Idaho power has completed the underground service at which time I will install the Expansion joint and Schedule 80 riser. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes Ok cover except for panel location. Panel needs moved from over stairs.
|
Permanent Service | 9/25/2017 | 9/25/2017 | 9/25/2017 | P | PASS |
Mark Moncarr
|
|
|
p/s u/g n ok. Eliminating o/h service to underground.
|