Final | 4/18/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Todd McCulloch final ok
|
Electrical Rough-In | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Todd McCulloch Ok cover. Entry closet and powder bath converted to 1 large bathroom. Bath outlet is junctioned in ceiling light, too short to relocate. Cutin can to be used to house LED light for shower.
|
Conference | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | DONE |
James Ady
|
|
|
Requesting prelim conference prior to electrical work. Please call to confirm time, if possible. Phone #: ###-#### Inspection requested via web by Todd McCulloch Bathroom remodel. Talked about wire splicing, Vanity recep location and amperage, rating of Fan/Light combo if left in shower, Wire support, box fill and when to call for inspection
|