Final | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Ok final.
|
Permanent Service | 1/3/2018 | 1/4/2018 | 1/4/2018 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Don Conley p/s o/h n ok
|
Electrical Rough-In | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Ok cover kitch, bed and bath.
|
Conference | 9/22/2017 | 9/25/2017 | 9/25/2017 | A | DONE |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Talked about relocation of service. Small porch addition was added which makes the o/h mast more than 4ft back from the facia. Also split buss panel will have a few circuits added too it. Split buss panels are no longer a listed item. Once circuits are added, panel needs to be replaced due to load capabilities.
|