Final | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Steve VanWinkle Spoke with contact 3-26-18 and he stated inspection would be cancelled if monument sign is still part of scope of work. As of 3-26-18 monument sign not part of work order. 2 wall signs only final ok
|
Electrical Rough-In | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | PASS |
Rock A. Hudson
|
|
|
Sign is being installed today Phone #: ###-#### Inspection requested via web by Steve VanWinkle 2 wall signs only, spoke with contractor and monument sign not included in work order at this time. He check into this sign listed on permit a schedule accordingly. ' Listing and disonnecting means confirmed on wall signs only. Rough in ok
|