Final | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Final ok
|
Final | 6/21/2018 | 6/22/2018 | 6/22/2018 | P | CANC |
Eric Story
|
|
|
Phone #: ###-#### >> Inspection requested via web by Tom Jenkins Inspection cancelled from web by: Tom Jenkins
|
Final | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PART |
Eric Story
|
|
|
We need a final inspection for the first floor. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins Temp occ ok
|
Final | 6/4/2018 | 6/7/2018 | 6/7/2018 | P | FAIL |
Eric Story
|
|
|
Please try to be after 2pm please call a little ahead will need to run over to meet you. Phone #: ###-#### Inspection requested via web by Tom Jenkins P Tac units not installed in corridors on 2nd floor and 3rd, need panel blanks and verify 36" clearences in front of panels where LV rack is in front of them on 2@3 floors
|
Conference | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | DONE |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Discussed what is needed for temp final
|
Final | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PART |
Eric Story
|
|
|
1st floor rooms Phone #: ###-#### Inspection requested via web by Tom Jenkins 1st floor units ok
|
Electrical Rough-In | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PASS |
Eric Story
|
|
|
1st floor ceiling hallway Phone #: ###-#### Inspection requested via web by Tom Jenkins 1st floor suspended ceilings only ok to cover
|
Electrical Rough-In | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
Eric Story
|
|
|
We need a pool light potting inspection please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Potting for pool lights and hot tub ok to cover
|
Final | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | PART |
Eric Story
|
|
|
We need a second floor partial for guest rooms. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins All units on 2nd floor checked out fine
|
Electrical Rough-In | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | PASS |
Eric Story
|
|
|
We need a ceiling cover inspection for 2nd floor corridor. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins 2nd floor corridor ceilngs ok to cover
|
Conference | 5/14/2018 | 5/15/2018 | 5/14/2018 | A | CANC |
Eric Story
|
|
|
We need a second floor final. Thank you. Phone #: ###-#### >> Inspection requested via web by Tom Jenkins Inspection cancelled from web by: Tom Jenkins
|
Electrical Rough-In | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | PASS |
Eric Story
|
|
|
Ceiling cover Phone #: ###-#### Inspection requested via web by Tom Jenkins Elevator lobby in floors 2,3,4 and laundry room ceilings only ok to cover
|
Electrical Rough-In | 5/8/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Eric Story
|
|
|
Breakfast are a ceiling Phone #: ###-#### Inspection requested via web by Tom Jenkins Breakfast area hard lids only ok to cover
|
Electrical Rough-In | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Eric Story
|
|
|
Lobby ceiling Phone #: ###-#### Inspection requested via web by Tom Jenkins Lobby hard lid ok
|
Final | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | PART |
Eric Story
|
|
|
partial- 3rd floor guestrooms final Phone #: ###-#### Inspection requested via web by Tom Jenkins 3rd floor rooms checked out fine
|
Electrical Rough-In | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | PASS |
Eric Story
|
|
|
Ceiling cover for Pool and Reception area Phone #: ###-#### Inspection requested via web by Tom Jenkins Hallway to pool and pool hard lid and front desk ok to cover
|
Final | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | PART |
Eric Story
|
|
|
Check flourth floor 4th floor bugged out fine in all units only...
|
Final | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | CANC |
Eric Story
|
|
|
Partial- 4th floor rooms Phone #: ###-#### Inspection requested via web by Tom Jenkins
|
Electrical Rough-In | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Eric Story
|
|
|
1st floor soffit, 3rd floor Ceiling grid, 4th floor ceiling grid Phone #: ###-#### Inspection requested via web by Tom Jenkins 1st floor and 3rd@4th floor ceilings only ok to cover(will need to erify removal of cords for fire dampers)
|
Electrical Rough-In | 3/26/2018 | 3/27/2018 | 3/27/2018 | P | PASS |
Eric Story
|
|
|
1st guest room bathroom ceilings Phone #: ###-#### Inspection requested via web by Tom Jenkins 1st floor bath drop ceilings minus flight room ok to cover
|
Electrical Rough-In | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | PASS |
Eric Story
|
|
|
1st floor wall cover Phone #: ###-#### Inspection requested via web by Tom Jenkins 1st floor comercial area walls only ok to cover
|
Electrical Rough-In | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | PASS |
Eric Story
|
|
|
2nd floor bathrooms and porte cortier Phone #: ###-#### Inspection requested via web by Tom Jenkins 2nd floor and car port ok to cover
|
Electrical Rough-In | 2/28/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Eric Story
|
|
|
1st floor rooms Phone #: ###-#### Inspection requested via web by Tom Jenkins 1st floor units only ok to cover
|
Electrical Rough-In | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins 2nd floor units ok to cover
|
Rough-In Permanent Service | 2/20/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Eric Story
|
|
|
Prefer late morning inspection if possible. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins p/s u/g n ok Fault current calc at 69,000 and breaker is rated 100,000
|
Electrical Rough-In | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PART |
Eric Story
|
|
|
Rough in of guest-room bathrooms 3rd floor Phone #: ###-#### Inspection requested via web by Tom Jenkins 3rd floor guest bath hard lids
|
Electrical Rough-In | 2/7/2018 | 2/8/2018 | 2/8/2018 | A | PASS |
Eric Story
|
|
|
4th floor guestroom restrooms Phone #: ###-#### Inspection requested via web by Tom Jenkins 4th floor bath hard lids only ok to cover
|
Electrical Rough-In | 2/6/2018 | 2/7/2018 | 2/7/2018 | A | PASS |
Eric Story
|
|
|
3rd floor rooms Phone #: ###-#### Inspection requested via web by Tom Jenkins 3rd floor units ok to cover. Warning given for staging sheetrock in units against walls pior to inspection
|
Electrical Rough-In | 1/12/2018 | 1/12/2018 | 1/12/2018 | P | PASS |
Eric Story
|
|
|
Half of 4th floor Phone #: ###-#### Inspection requested via web by Tom Jenkins From unit 422 and all of west units to the stairwat ok to cover walls and hard lids
|