Final | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | PASS |
Eric Story
|
|
|
Please call half an hour before inspection to insure access. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Final ok
|
Electrical Rough-In | 10/6/2017 | 10/6/2017 | 10/6/2017 | P | PASS |
Mark Moncarr
|
|
|
We will be ready anytime after 10am this morning. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman ok cover
|
Conference | 10/3/2017 | 10/3/2017 | 10/3/2017 | P | DONE |
Mark Moncarr
|
|
|
Please call before you come up I should be here all day. Would like to discuss some existing situations. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Discussed bonding main water coming in. Also discussed location of outlets in downstairs living. New floor to ceiling windows installed. Floor is all concrete. On both sides of windows there will be no outlets within 6'. I will not require outlets to be placed in these locations. It would require saw cutting about 20' of concrete to add 2 outlets, not a cost effective addition.
|