Final | 12/17/2017 | 12/18/2017 | 12/18/2017 | A | PASS |
James Ady
|
|
|
Please call Jose Guerrero for access to home. Phone #: ###-#### Inspection requested via web by Jose Guerrero final ok
|
Final | 12/12/2017 | 12/15/2017 | 12/15/2017 | A | FAIL |
James Ady
|
|
|
Please call Jose for access to home. Phone #: ###-#### Inspection requested via web by Jose Guerrero No access, reschedule
|
Electrical Rough-In | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | PASS |
James Ady
|
|
|
Please call to coordinate with Jose Guerrero for access to home. Phone #: ###-#### Inspection requested via web by Jose Guerrero 2 wire receps installed in house. Kitchen and panel area only Rough in ok
|
Electrical Rough-In | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Guerrero Needed perm serv
|
Permanent Service | 10/4/2017 | 10/4/2017 | 10/4/2017 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Guerrero p/s o/h rec ok
|
Conference | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | PASS |
James Ady
|
|
|
Talk to Jose Phone #: ###-#### Inspection requested via web by Jose Guerrero Talked about panel location and clearences. Running Service entrance surface mount to new panel location. Existing meterbase Clearance and service drop location OK'd by ID Power.
|